NewsLetter Q2

We are pleased to share the key maintenance, infrastructure, safety, and community initiatives completed during Q2, along with the major works planned for Q3.

Newsletter

Have a Question?

Security +91 8088891770

fm@slssquare.org

Q2 – Works Completed

Infrastructure & Maintenance

  • STP Filters Replacement – STP filters were replaced and the basement STP filter-related issue was fixed.
  • Sand Filters – Sand filters were replaced.
  • STP Blowers – Issues with the STP blowers were identified and rectified.
  • DG Set Maintenance – Two-year maintenance of the DG set was completed.
  • Block Battery Replacement – Batteries were replaced in A, B, D, E and F Blocks.
  • A Block Seepage – The root cause of the A Block seepage was identified and rectification
  • work has started. The work is targeted for completion by mid-October.
  • Garbage Collection – Night-time garbage collection has been stopped. Garbage collection is now restricted to daytime hours to improve safety and operational efficiency.
  • Deep Cleaning – Deep cleaning of all blocks was completed.

Safety & Security

  • Safety Equipment – New safety cones and Q-managers were purchased and deploye
  • Pigeon Control

Pigeon nets were installed on terraces and along the corridor sides of A, B, C, E and F Blocks. This has significantly reduced pigeon access to ducts and helped reduce the effort required to clean pigeon waste by around 90%, improving hygiene and reducing associated health concerns. Around 10% of pigeon access still remains through ground-floor pathways, and additional measures are being planned to address this.

  • New Pagodas

New pagodas were purchased for community events. The cultural team previously spent more than ₹70,000 every year on this requirement. Our team has also learned the installation process, which can save approximately ₹5,000 per event and eliminates dependency on vendors for installation.

  • Hopscotch Facility: A new hopscotch facility was created for children, providing a simple, low-cost activity with high utilisation.
  • Independence Day & Children's Activities: Independence Day was celebrated with community participation. Chess, Karate and Bharatanatyam performances by children were organised during Teachers’ Day celebrations, along with teacher felicitation.
  • Fresh Water Sump : Work on a fresh water sump was initiated; however, due to certain issues, the work could not proceed further and has been taken up again as a priority in Q3.
  • Iron Pressing Facility: An iron pressing shop was introduced within the society for residents' convenience.
  • Parcel & Postal Management: With the support of a resident volunteer, a parcel organiser was arranged at the security gate, streamlining parcel collection. Dedicated space was also created for incoming postal letters to keep them organised.

To improve transparency, continuity and professional communication, SLS Square is implementing standardised society email IDs for official communication, reducing dependence on personal email accounts.

  • Facility Management (FM): FM@slssquare.org
  • General Information: Info@slssquare.org
  • President: President@slssquare.org
  • Secretary: Secretary@slssquare.org
  • Treasurer: treasurer@slssquare.org
  • Vice President: vp@slssquare.org

Residents are encouraged to use these official email IDs for relevant society-related communication.

24/7 Security Helpline

  • A dedicated 24/7 Security Helpline – 8088891770 is available for residents to report urgent security or community-related concerns, including:
  • Smoking-related issues in common areas
  • Noise disturbances and loud music
  • Any security concern or incident requiring immediate attention
  • Residents are requested to contact the security team promptly whenever such issues arise.

Security Patrolling & MyGate Integration

Security patrolling has been implemented to strengthen monitoring across the community and help maintain a safe and peaceful residential environment. As a further improvement, the RWA is planning to integrate security patrolling activities with MyGate to improve tracking, monitoring and accountability. These initiatives reflect SLS Square's continued commitment to structured communication, enhanced security and a better living experience for all residents.

Q3 – Planned & Ongoing Works

The following works are planned or already being initiated during Q3:

  • Fresh Water Sump – Resume and complete the fresh water sump work on priority.
  • Front Gate Elevation – Rectify the front gate elevation/entry area to address difficulties faced by cars and two-wheelers while entering.
  • Garbage Area Improvement – Construct/improve the garbage area at the corner to better contain waste and minimise odour and hygiene issues.
  • C Block Terrace Tiles – Repair the loose/damaged terrace tiles, targeted for completion by 30 October.
  • A Block Parking Seepage – Continue and complete the ongoing seepage rectification work in the A Block parking area.
  • Parking Line Painting – Repaint parking lines and boundaries across the required areas.
  • Swimming Pool Renovation – Undertake swimming pool renovation, including water replacement and rectification of seepage issues in the pump house.
  • MSG Pathway & Seating – Develop/improve the pathway and seating area around the Multi-Sport Ground.
  • Painting Works – Take up identified painting and touch-up works across common areas.
  • Terrace Cable Management – Organise and rectify Airtel, ACT and other telecom/DTH cables on terraces. Airtel-related work has already been initiated, and resident volunteers are being explored to help coordinate this activity.
  • CCTV Enhancement – Install additional CCTV cameras at identified locations. Vendors have been shortlisted and quotations received; negotiations are underway to optimise the cost before proceeding.
  • Open Pathway Repairs – Address other identified pathway and open-area repair works. Some of these works require suitable weather conditions and are planned to be taken up during summer.
  • Together, We Continue to Improve SLS Square

    Our focus remains on maintenance, safety, hygiene, infrastructure improvement, cost optimisation and better community facilities. Some works require vendor availability, resident coordination, budget planning and suitable weather conditions, so they will be taken up in a phased manner. We thank all residents, volunteers, cultural committee members, housekeeping, security and FM team members for their continued support and cooperation.

    Thanks & Regards